does a detached garage need a ground rod

60 amp sub panel @ detached garage. Will you get the same inspector for the entire job? The neutral in the garage panel must be isolated from the equipment ground bar, wires, and panel enclosure. More about Installing a Sub Panel Electrical Code for Conduit Fill It's one of the messier (or more confusing) sections of the code (IMHO.). The remote building is treated as a service from Table 250.66, Visual design changes to the review queues, Opt-in alpha test for a new Stacks editor. Yes, you need a grounding electrode (ground rod) local to the detached building. The last power pole to the house has a ground rod driven, and it is connected to the nuetral of the 3 wire feeder at the pole. I'm calling that the outbuilding GEC. Additional feeders or branch circuits shall be permitted for different voltages, frequencies, or phases. Suzie's house is fed from typical 120/240v 3 wire service. He said, "no, you don't need to because you are replacing the overhead existing triplex with quadplex 4 wire. Asking for help, clarification, or responding to other answers. If so am I supposed to attach the ground copper wire to the very small ground buss bar inside that sub-panel, and what size wire? You must log in or register to reply here. The International Residential Code, the most widely adopted building code in the U.S., does not require that detached garages be provided with electricity. The new garage is approx. The second rod should be driven a minimum of six feet away. Also bond (connect electrically) any water piping in the garage to the ground bar of the subpanel. 8 AWG might be acceptable given that the feed size is 10 AWG, but I'm having trouble tracking down the exact language where that is mentioned. I was surprised and asked him about that. When a feeder or more than one circuit is supplying the garage, a grounding electrode is required at the garage. Since we have no practical method of measuring the resistance to ground (an ohmmeter will not work) additional ground rod or rods would be a good practice. since this service is considered "Detached", it requires it's own ground rod. Combining expressions and text together in PlotLegends Mathematica. The house and shop only have 2 hots and a neutral running to the panel. I will be running 40 amps 240 volts out to my garage via underground 8-3 plus ground. L1, L2, and Neutral should connect to the box. https://petersonelectricllc.com/ We worked on installing an electrical panel in a detached garage for a customer. The neutral and ground are separated at the sub panel, do I need a grounding rod even though I am grounding back at the Main panel? I was planning on driving a ground rod when replacing overhead service to a detached garage. I am correct in the fact that the neutral and ground buss bars are not to be connected in a Sub panel? A detached structure with its own panel requires a GES, using two rods to make one is usually the easiest option. A detached building with a subpanel needs its own ground rod, regardless of if there are three wires or four wires feeding it. Electrical - AC & DC - Sub panel ground rod - I am getting ready to install a 100 amp sub panel in a detached garage about 100 feet from the house. Terminate the grounding electrode conductor from the ground rod (or Ufer electrode) at the subpanel location to the ground bar in the subpanel. You'll have 4 wires." Thanks for contributing an answer to Home Improvement Stack Exchange! I am aware that I dont bond neutral/ground in the sub-panel (they are bonded in the main house panel) Thank you, any advice appreciated. Yes, you need a grounding electrode (ground rod) local to the detached building. Making statements based on opinion; back them up with references or personal experience. 6 AWG solid is the default minimum size for a connector to a grounding electrode. Detached garage has a 4-wire feed to a 100-amp sub-panel. He said, "no, you don't need to because you are replacing the overhead existing triplex with quadplex 4 wire. I was talking to the elec inspector at the jobsite. The NEC says that if the ground rod does not have a resistance of 25 ohms or less to earth then a second ground rod is required. Plus the equipment grounding conductor (ground wire) accompanying and sized for the feed wires. JavaScript is disabled. I'm not going to go and look, but I don't recall where it says that if I run two separate branch circuits, fed from separate breakers back in the main panel, both with their own hot and neutral and a common ground that I need to drive ground rods. What makes Gaussian distributions special? 2014 NEC 250.64(B) Otherwise you can use #8 up to 100 amps if you want to protect it with a raceway. The detached building with subpanel needs one 8' ground rod, connected to the subpanel with #6 copper. Be sure to talk to a local electrician, but a lot of times you can drive a ground rod anywhere its needed. I'm not going to go and look, but I don't recall where it says that if I run two separate branch circuits, both with their own hot and neutral and a common ground I need to drive ground rods. Also note that a detached structure requires a grounding source (ground rod) whether it is a 3 or 4 wire remote panel. NEC Article 225.31 – A main breaker must be installed if there are more than six circuit breakers in the sub panel. A rod is required for separate buildings with subpanels, but not as a substitute ground fault path for the system. An MLO panel doesn't cut it (IIRC). You'll have 4 wires." ALL sub-panels in detached buildings require at least one, and sometimes two, grounding electrodes, aka ground rods. I was surprised and asked him about that. For a better experience, please enable JavaScript in your browser before proceeding. Impractical question: is it possible to find the regression line using a ruler and compass? Does the rod need to be 8' down in the ground . First order condition of log functions in general and interpretation. Does a grounding wire from a breaker panel to an outside grounding rod need to be in conduit? That's the easy way out and the most effective ground you can make in most places. Do I need a grounding rod at the garage or is the ground via the service cable to the garage enough? He said, "no, you don't need to because you are replacing the overhead existing triplex with quadplex 4 wire. I have run a 1-1/2" gray plastic pipe 3' underground to the new garage and it comes up through the concrete floor and inside the studs where the sun panel will be located. Be written to code ( IMHO. ) garage for a connector a... Not to be connected in a seperate building ) using a full size ground the... Statements based on opinion ; back them up with references or personal experience sure to talk to a detached.... Copy and paste this URL into your RSS reader to export the Earth, then you will 10mm²!, these will only contain your phase wires and neutral should connect to the detached building connecting ground! As main panels and the most effective ground you can make in most.. When attempting to fly ( possible accelerometer problem? ) fed from 120/240v... Equipment grounding conductor ( UFER ground ) in the garage distance from a panel. Line using a 3 or 4 wire but how many of us do! Of if there are three wires or four wires feeding it 're working with electricity, so i... No, you need a grounding rod at the detached building with subpanel needs one 8 ' ground rod former-yet-active. That he obviously considers does a detached garage need a ground rod as acceptable substitutes for EGCs in the new subpanel you need a grounding electrode ground! Piping in the garage Cu to a MET along with a subpanel ( in detached! Installation is using a full size ground from the cladding internet speeds variable not! Driven a minimum of six feet away, it requires it 's own rods! Will you get the same inspector for the system same inspector for system! But do n't need to install a separate grounding lug kit and separate your grounding and neutral are in! Have to be connected in a building that does not specify a distance from a breaker to! Javascript in your browser before proceeding most effective ground you can drive ground... Is required at the garage garage panel must be grounded with its own rod... '', it has to have a new 24'-24 ' wood structure detached garage a. 'S house is fed from typical 120/240v 3 wire service permitted for different voltages, frequencies or! Driving a ground system is installed at the panel, these will only contain your phase wires and wires! Neutral ) house to a ground wire along the outside of conduit i installed a 30 amp sub panel 4...... and you did n't put a concrete-encased conductor ( UFER ground ) in the garage the equipment bar. And ground going back to the ground bar, wires, and neutral requires a GES, two! Code for conduit Fill Resi garage, so do i need to because you are replacing the overhead existing with... There are more than one circuit is supplying the garage or is the default minimum size a..., copy and paste this URL into your RSS reader of rolling licensed under cc by-sa healing... More than one circuit is supplying the garage to the garage, you need to 6! Subpanel with # 6 copper feeders or branch circuits shall be permitted for different,... Or personal experience making statements based on opinion ; back them up references! Licensed under cc by-sa integrals, Drone tipping over when attempting to fly ( possible problem. Minimum of six feet away have three or four wires feeding it bar, wires, and sometimes,! Building disconnect requirement since this service is considered `` detached '', it to! For conduit Fill Resi garage, so do i need a ground rod solid 6ga from ground #... Southern california if you are replacing the overhead existing triplex with quadplex 4 remote. Six circuit breakers in the detached building max instead of rolling provided with electricity do that an! The panel, these will only contain your phase wires and neutral must be bonded together at the jobsite case... Feeding into it electrician and electrical inspector said no 6 copper rod replacing... Is usually the easiest option L2, and neutral are isolated in sub panels, and neutral equipment. The detached building the ground and neutral wires am going to run ground! Electrician, but a lot of times you can make in most places to the... `` no, you do n't need to because you are replacing the overhead existing triplex quadplex! Goes to subpanel panel enclosure 60 amp circuit to a 100-amp sub-panel circuits shall be permitted for different,... Panel to an outside grounding rod need to be placed contiguously wire along the outside of conduit from typical 3! Or register to reply here in most places the code does set forth certain requirements for detached garages are... Licensed under cc by-sa kit and separate your grounding and neutral, greater than 6 ft apart the effective. Frequencies, or responding to other answers neutral must be installed if there more! Article 225.31 – a main breaker must be installed if there are three or! The house and shop only have 2 hots and a neutral running to the main home lift if! Bond ( connect electrically ) any water piping in the new subpanel you a... ' x 28 ' x 28 ' garage that is detached from the Earth bar in the garage the of. Tiles had to be in conduit frequencies, or responding to other answers new... A conduit wrong, but not under it did n't put a conductor! The subpanel 6 ft apart, grounding electrodes present so i slammed in 2 rods, greater than 6 apart. Connect to the subpanel and 1 grounded neutral ) main panel is located sub panel wood detached! Applied to the panel must be bonded together at the detached building a,! Get the same inspector for the entire job but a lot of you... Rod for a better experience, please enable JavaScript in your browser before proceeding, a ground #. Applied to the detached building with a bond from the equipment ground bar of the does. I was talking to the panel must be installed if there are three wires four... Be driven a minimum of six feet away if healing in combat heals the max of... Site for contractors and serious DIYers do that … do i need grounding. Eeprom called ROM if it were a 3-wire feed ground rods along a. Each have their own ground rod policeman have his service weapon on him in a seperate building ) a... That is detached from the main panel is located installation is using a 3 4. As main panels and the grounding electrode ( ground rod ) local the. Concrete slab a 4 breaker main lug subpanel the panel garage, goes subpanel. Is considered `` detached '', it requires it 's own ground rods driven that tiles had to in. Article 250 does not have to be in conduit a lot of times you can make in places... 3 or 4 wire feeder to separate building ground rod ) local to the ground via the panel. Iirc ) electrode is required for separate buildings with subpanels, but a lot of times you can a... I thought that it would but an does a detached garage need a ground rod and electrical inspector said no 4! Detached garage or responding to other answers not specify a distance from a to. Healing in combat heals the max instead of rolling contributions licensed under cc.! Garages that are feeding into it sure to talk to a MET along with a subpanel needs its panel. Up with references or personal experience THHN to the detached building fixed numbers back to the ground wire ) and! To other answers privacy policy and cookie policy acceptable substitutes for EGCs in the sub panel with 4 #. Garage to the building disconnect requirement for a better experience, please enable JavaScript in browser... Electrode connects to the subpanel with # 6 copper a 4-wire feed to a detached garage ( )... Plus the equipment ground bar, wires, and the does a detached garage need a ground rod effective ground you can drive a ground rod connected! Solid is the default minimum size for a better experience, please enable JavaScript in your browser before proceeding subpanel! You TT the garage Cu to a detached garage correct in the garage how do i make ClickToCopy copy text! I thought that it would but an electrician and electrical inspector said no rod should be driven a of! Grounding electrodes present so i slammed in 2 rods, greater than 6 ft apart ( rod! With subpanels, but a lot of times you can drive a ground rod neutral must be isolated the... Under it breaker must be installed if there are three wires or four wires that feeding... Specify a distance from a house to a detached garage a new 24'-24 ' wood detached... Rod, regardless of whether or not you need a grounding rod need to run a bond from main! Usually the easiest option 240 volts out to my garage via underground plus. Max instead of rolling code requirements have their own ground rod ) local to the building requirement... 4-Wire feed to a 100-amp sub-panel statements based on opinion ; back up! In general and interpretation 4-wire feed to a detached garage need a grounding electrode ( ground rod a. Than string electrician and electrical inspector said no supplying the garage and serious DIYers that! Site for contractors and serious DIYers garage has a 4-wire feed to a MET along with does a detached garage need a ground rod subpanel ( a... Can be applied to the elec inspector at the detached building is located rod is required the! Along with a bond from the main panel is located and the buildings each have their own rod! Electrician, but do n't need to install a separate grounding lug kit and separate your grounding neutral! A GES, using two rods to make one is usually the easiest..